Development of the Eastern and Northern Wall of Cairo

the first phase included the restoration of part of the northern Cairo wall from Bab al-Nasr to Baha Street, while the second phase included the restoration of another part of the northern wall between Al Nasr and al-Futuh gates to Darb al-Bazaza. 

Screenshot 2023-12-12 at 11.23.10 AM.png

Sultan Hassan Mosque

The total cost of the project exceeded one million dinars. The mosque has been subjected to many restoration and rebuilding operations throughout the ages until the twentieth century, as most of the Islamic monuments in Cairo.

Screenshot 2023-12-12 at 11.58.13 AM.png

Development of the Ahmed Ibn Tulun Mosque

Mosque or Ahmed Ibn Tulun Mosque or the Tulunid Mosque is one of the famous archaeological mosques in Cairo . It built by command of Ahmad Ibn Tulun founder of the state Tulunid year 263 AH / 877 AD new hometown of Alktaea to become the third mosque mosque built in the Islamic capital of Egypt after the Mosque of Amr Ibn al - built in Fustat

Screenshot 2023-12-12 at 11.53.45 AM.png

The renovation of Sultana Malak’s Palace -Heliopolis

within the framework of the cooperation protocol signed between the Ministry of Communications and Information Technology represented by Telecom Egypt, and the Ministry of Business Sector represented by Heliopolis Housing and Development Company And the Ministry of Education and Technical Education.
This comes within the framework of the government to transform buildings of cultural value into centers for developing creativity and entrepreneurship among youth.

Screenshot 2023-12-12 at 11.39.00 AM.png

King Farouk Rest House - Inshas - Belbeis

Inshas, whether accompanied by Queen Farida or accompanied by the royal entourage arabia . On the land of Al Sharqiya, the palace of King Farouk in the village of Basateen Inshas, the center of Belbeis.

Screenshot 2023-12-12 at 11.51.41 AM.png

Restoration and development of Qaitbay -Al Gamaleya

This project is considered on the unique projects to renovate and restore the historical shopping center of Qaitbay, which dates back to the Mamluk era (885 AH / 1481AD). To become a heritage hotel of a special nature

Screenshot 2023-12-12 at 11.31.23 AM.png

Cairo Heritage Development

“The Historic Cairo development project will bring about a civilizational shift in the capital and restore the civilized and aesthetic appearance of the heritage and historical areas. The project is estimated to cost 30 billion pounds, and enjoys continuous follow-up by Prime Minister Mostafa Madbouly, and the political leadership, in order to eliminate urban deformation, revitalize historic Cairo, return it to its former state.

Screenshot 2023-12-12 at 11.37.02 AM.png

The Sayeda Zainab Mosque Development Project

The sayeda Zainab Mosque in Cairo is one of the largest and most famous mosques in Cairo, the capital of Egypt, and is attributed to Zainab bint Ali bin Abi Talib. The Sayyida Zainab mosque and scene is located in the Sayyida Zainab neighborhood in Cairo, where the neighborhood took its name from the owner of the shrine located inside the mosque, and it is in the middle of the neighborhood and the square opposite the mosque is also known as Sayeda Zainab Square. The project includes the restoration and maintenance of the exterior and interior facades, architectural elements, roof, and floors of the mosque.

Screenshot 2023-12-12 at 11.46.24 AM.png

Salamlek Palace

This palace is one of the most important buildings built in the park gardens. It was the royal summer residence of the king and queen before the construction of the Haramlek Palace in 1928. 

Screenshot 2023-12-12 at 12.00.13 PM.png

Bab Zuweila Development Project

The project includes the development and upgrading of (135) the facades of the buildings located in the Al-Roum and Al- Khayamiya neighborhood in the Bab Zuweila area, another building of good and medium condition of an archaeological nature, in addition to the restoration of (19) archaeological buildings and the exploitation of a number of lands and spaces and the establishment of units 63 new residential and commercial buildings (and changing the activity of some existing buildings in the area.

Screenshot 2023-12-12 at 11.56.05 AM.png

Princess Fawkia Palace

The restoration operations were repeated, which were subjected to extensive study and careful analysis of samples of the materials used since the construction of the first building. The restoration process also included structural consolidation works, roof strengthening and facade repair operations

Screenshot 2023-12-12 at 11.48.49 AM.png

Development of the Postal Museum - Ataba

The restoration and renewal works of the Egyptian Postal Museum, located in the historical building of the Post Authority in the Ataba area, has begun in the context of preserving the governmental assets and heritage buildings.

Screenshot 2023-12-12 at 11.24.51 AM.png

Restoration project of the two minarets of Al-Hakim Mosque

The project includes the restoration and maintenance of the external and internal facades of the evaporators and decorations stone.

Screenshot 2023-12-12 at 11.29.36 AM.png

Ras El Tin Palace

Its construction and furniture became more beautiful and modern, and a mosque with a distinct architectural character was built on part of the palace area. The princesses’ building was added by King “Farouk” to the palace

Screenshot 2023-12-12 at 11.34.55 AM.png

Al-Amir Qanibay Mosque

The project aims to restore the mosque, preserve the architectural decorations and restore them to their original state with the help

of with historical references, the project includes restoration and maintenance of the external and internal facades and architectural elements, roof and floors.

Screenshot 2023-12-12 at 11.43.22 AM.png

Qanatir Charity Development Project

A defect appeared in some of the Qanatir al- Khairiya eyes in 1867 due to the pressure of the water, so Khedive Ismail directed his care to remedy this defect, and entrusted this to the engineers of his time, namely: Mogil Bey (and he had left Egypt for France ), Bahjat Pasha , and Mazhar Pasha , Then Mr. Fuller, the English engineer, accomplished this reform during the reign of Khedive Ismail .

Screenshot 2023-12-12 at 11.41.38 AM.png